Contract Demand Optimiser

Free calculator from Wisdom Techno Solutions, Vadodara — instant result, detailed report on request

Free tool for HT consumers with a billing floor

Contract demand optimiser

Paste the maximum demand from your last twelve bills and the demand charge rate. See what the current contract demand costs you a year, the contract demand that would cost least under the billing floor and penalty rules, and the saving from changing it. Runs in your browser; nothing is uploaded.

This calculator needs JavaScript. If nothing appears below, enable JavaScript or send us your bill and we will run the numbers for you.

Your figures

Required

Any number of months works; order does not matter

Assumptions you can change

Gujarat HT tariffs bill at least this share

Check your tariff order

Indicative calculation; verify with engineering before ordering.

Your numbers

Fill in the required figures to begin.

Why the right contract demand is a calculation, not a guess

Two costs pull in opposite directions

Set the contract demand high and you pay the billing floor every month you do not reach it, typically 85 per cent of contract even if you used far less. Set it low and every month you exceed it is billed at a penalty multiplier on the excess. The cheapest contract demand sits between the two, and it depends on the shape of your twelve months, not on the average.

What the optimiser does

It tries every contract demand between your lowest and highest recorded demand and adds up twelve months of charges under the floor and penalty rules you set, then picks the lowest. It shows how many months would exceed the new figure, so you can judge the operational risk of being over contract.

Before you apply to the DISCOM

A reduction is usually allowed once a year and may need a load study; an increase is quicker. Peak shaving with a battery changes the picture again, because it lowers the recorded demand itself. The feasibility study runs both together.

How often can contract demand be changed?

Most Gujarat DISCOMs allow a reduction once in a financial year with notice, and an increase on application subject to network capacity. Check your current tariff order and agreement.

Is it risky to set contract demand below my highest month?

A little. The months above it are billed at the penalty multiplier on the excess only, which the optimiser includes. If the saving still comes out positive, the penalty in those months is cheaper than the floor in the others.

Does a battery change the answer?

Yes. Peak shaving lowers the recorded maximum, which lets you reduce contract demand further. Run the demand charge calculator first, then re-run this with the shaved figures.

What could you save?

Enter your monthly electricity bill and see where the money goes, in two minutes.

₹
Talk to a solar engineer
+91 80002 29727

Solar + BESS questions answered (FAQ) →

Green Energy Solutions

Illustration: Solar + BESS EPC

Solar + BESS EPC

Solar, storage and hybrid plants for industry, with the switchboards built in our own works.

Explore Now
Illustration: Industrial Solar EPC

Industrial Solar EPC

Captive rooftop and ground-mount solar with the electrical side engineered in-house.

Explore Now
Illustration: Battery Storage (BESS) EPC

Battery Storage (BESS) EPC

Storage that holds your plant up when the grid drops and trims demand charges.

Explore Now
Illustration: Hybrid Solar + BESS

Hybrid Solar + BESS

Solar and storage under one EMS to cut DG hours and peak demand.

Explore Now
Illustration: Electrical Balance of Plant

Electrical Balance of Plant

LT switchboards, ACDB, DCDB and protection built and tested in Vadodara.

Explore Now
Solar ACDB / DCDB

Solar ACDB / DCDB

AC and DC distribution boards for solar plants, from our Vadodara works.

Explore Now