Solar, storage and hybrid plants for industry, with the switchboards built in our own works.
Electricity bill analyser
Landed cost per unit, demand charge share, load factor and where the saving is. Start here.
Analyse my bill
Fifteen free engineering tools
Work out your own numbers before you talk to anyone
The calculators our estimation team uses as a first pass, in your browser. The headline numbers are instant and free. The detailed report, with sizing, capex and payback, is unlocked once with a code to your work email and then stays open across every tool. Nothing else is sent anywhere.
Start here if the question is what you pay and where the saving is.
Landed cost per unit, demand charge share, load factor and where the saving is. Start here.
Analyse my billWhat the DISCOM bills you for demand, and what a peak-shaving battery saves every month.
Calculate my savingCapacitor bank to reach your target PF, the kVA it frees, the penalty avoided and the payback.
Size my APFCWhat a battery earns by charging at night and discharging in the peak, and the size that fits.
Calculate my spreadTwelve months of maximum demand to the contract demand that costs least under the floor and penalty rules.
Find my best contract demandTrue landed cost of open access power after surcharges, wheeling, losses and banking, and the saving.
Calculate my savingSizing, payback and generation for a plant that wants to generate and store its own power.
What a diesel unit really costs, the storage that replaces most DG hours, and the payback.
Size my storageSolar sized to your daytime load, whether storage fits, capex and payback of each option.
Estimate my paybackCritical load and autonomy hours to kWh, PCS kW, cabinets or containers, floor space and capex.
Size my batteryDistrict yield, roof area to kWp, year-one and 25-year units, saving and carbon avoided.
Estimate my generationBaseline emissions, tonnes avoided by solar and storage, renewable share, tree equivalent.
Calculate my emissionsFor engineers specifying the switchboard, cables and transformer the plant will hang on.
Loading today, incomer current and rating, and how much solar your transformer can take before an upgrade.
Check my transformerFull-load current, breaker rating, cable size for current and voltage drop, parallel runs.
Size my cableStandard flat bar section per phase, bars per phase, current density, neutral and earth, weight per metre.
Size my busbarShort-circuit current at the LT bus, peak current, switchboard Icw and breaker Icu to specify.
Calculate my fault levelSend twelve months of bills and get a six-page feasibility study in three working days: real cost per unit, a sized system, payback and an indicative single-line diagram.
Get a free feasibility studyIndicative calculation; verify with engineering before ordering. Tariff thresholds, penalties and prices are editable in every tool; use the figures from your own tariff order and quotations.
Start with the bill analyser: it tells you where the money is going. If demand charges are a large share, go to the demand charge calculator and the contract demand optimiser. If DG hours are high, go to the DG replacement calculator and the battery sizing tool. The payback estimator and the generation estimator cover solar. The electrical design tools are for the engineer specifying the switchboard the plant will hang on, and every one of them tells you what to ask for rather than what we claim.
Enter your monthly electricity bill and see where the money goes, in two minutes.
Solar, storage and hybrid plants for industry, with the switchboards built in our own works.
Captive rooftop and ground-mount solar with the electrical side engineered in-house.
Storage that holds your plant up when the grid drops and trims demand charges.
LT switchboards, ACDB, DCDB and protection built and tested in Vadodara.
AC and DC distribution boards for solar plants, from our Vadodara works.