DG Replacement Calculator

Free calculator from Wisdom Techno Solutions, Vadodara — instant result, detailed report on request

Free tool for plants that run on diesel backup

DG replacement calculator

Enter your DG set rating, monthly running hours and diesel price. You get your real cost per unit on diesel, the storage size that would carry most of those hours, an indicative capex and the payback in years. Runs in your browser; nothing is uploaded.

This calculator needs JavaScript. If nothing appears below, enable JavaScript or send us your bill and we will run the numbers for you.

Your DG set

Required

Largest set, or total if they run together

From the hour meter or the diesel log

Your costs

What the battery charges at; use your landed cost

Longest outage the battery should carry alone

Assumptions you can change

0.28 to 0.35 for most sets at part load

Long outages still need the DG

Racks, PCS, switchboard, EMS and installation, indicative 2026

Indicative calculation; verify with engineering before ordering.

Your numbers

Enter the DG rating and running hours to begin.

How the calculator works

What a diesel unit really costs

A DG set at part load burns roughly 0.3 litres per unit generated. At ₹92 a litre that is ₹27 a unit in fuel alone, before lube, filters, service visits and the engine's own wear. Most plants land between ₹18 and ₹25 a unit once loading and maintenance are counted, against ₹7.5–8.5 from the grid.

How the battery is sized

The battery must carry your load for the outage length you choose. The calculator takes your DG load, multiplies by the outage hours, then allows for depth of discharge and conversion losses so the usable energy is what you need. The PCS is rated to the load. Both are rounded up to standard sizes.

What is counted as saving

  • Units that move from diesel to stored grid power, valued at the difference between your diesel cost per unit and the grid tariff with charging losses.
  • Maintenance hours avoided on the DG set.
  • Not counted: demand-charge savings, solar charging, avoided production loss from trips, and the DG set's extended life. All of these improve the real case.

When DG replacement alone is not enough

Below about 20 hours a month the diesel saving is small, and the battery has to earn its keep on demand charges and ride-through instead. That is the normal industrial case, and it is why we size storage from the bill and the trip log together. Run the bill analyser for the other half of the picture.

Why is diesel power so expensive per unit?

A DG set at part load burns about 0.28 litres per unit. At ₹92 a litre that is ₹26 before lubricants, filters, service visits and wear, against ₹7.5 to 8.5 from the grid. Every hour on DG costs two to three times grid power.

Can a battery replace my DG set completely?

For short and medium outages, yes. For a long outage the DG still starts, so most plants keep it as the last line of defence and run it a fraction of the hours they did before. The calculator assumes the battery takes 85 per cent of DG hours.

What if my DG hours are low?

Below about 20 hours a month the diesel saving alone is small. The battery then has to earn its keep on demand charges and ride-through, which is the normal industrial case; use the demand charge calculator for that half of the picture.

What could you save?

Enter your monthly electricity bill and see where the money goes, in two minutes.

₹
Talk to a solar engineer
+91 80002 29727

Solar + BESS questions answered (FAQ) →

Green Energy Solutions

Illustration: Solar + BESS EPC

Solar + BESS EPC

Solar, storage and hybrid plants for industry, with the switchboards built in our own works.

Explore Now
Illustration: Industrial Solar EPC

Industrial Solar EPC

Captive rooftop and ground-mount solar with the electrical side engineered in-house.

Explore Now
Illustration: Battery Storage (BESS) EPC

Battery Storage (BESS) EPC

Storage that holds your plant up when the grid drops and trims demand charges.

Explore Now
Illustration: Hybrid Solar + BESS

Hybrid Solar + BESS

Solar and storage under one EMS to cut DG hours and peak demand.

Explore Now
Illustration: Electrical Balance of Plant

Electrical Balance of Plant

LT switchboards, ACDB, DCDB and protection built and tested in Vadodara.

Explore Now
Solar ACDB / DCDB

Solar ACDB / DCDB

AC and DC distribution boards for solar plants, from our Vadodara works.

Explore Now