What a Solar ACDB Is, and What We Build
The AC distribution board takes the inverter's AC output and distributes it — to the plant loads, the metering point and the grid interface — with feeder protection, surge protection and safe isolation. It is the board the DISCOM inspector looks at, the board the net meter hangs off, and the point where the solar plant meets the rest of the electrical installation.
Wisdom Techno Solutions builds solar ACDBs at our Vadodara works in 1.6 mm or 2 mm CRCA sheet steel, powder coated, or in transparent polycarbonate IP65 enclosures for small rooftop systems. Boards are built for indoor or outdoor mounting with IP52, IP65 or IP67 protection as the location demands, wall, floor or stand mounted, with switchgear conforming to IEC 60947 and IS 8623.
- MCCB / MCB per feeder, rated to the inverter output and the load schedule
- AC surge protection device (Type II) protecting the distribution point
- Metering and net-metering provisions to the DISCOM's connection specification
- Isolation for safe maintenance of the plant-side and grid-side circuits
- Ferruled, labelled wiring to the approved drawing
- IEC 61439-1 assembly practice and MNRE guidelines
AC Distribution Board Technical Specifications
The table below is the standard build. Feeder count, breaker ratings, metering and enclosure execution are set from the inverter schedule, the DISCOM specification and the site.
| Parameter | Specification |
|---|---|
| Board type | ACDB — AC distribution board, distributing solar inverter output to loads, metering and the grid interface |
| Position in the plant | After the inverter (or after the AC combiner box in multi-inverter plants) |
| Phases | Three-phase and single-phase inverter outputs, per the inverter schedule |
| Feeder protection | MCCBs, MCBs and fuses per feeder, rated to the inverter output and load schedule |
| Surge protection | AC surge protection device (Type II), coordinated with the plant lightning-protection design |
| Metering | Energy metering and net-metering provisions per the DISCOM connection specification |
| Rated voltage | up to 690 V AC; 800 V class available — see the 800V LT Panel |
| Enclosure | 1.6 mm or 2 mm CRCA sheet steel, powder coated; transparent polycarbonate IP65 for small rooftop boards |
| Ingress protection | IP52 indoor; IP65 and IP67 options for outdoor installation |
| Mounting | Wall, floor or stand mounted, indoor or outdoor |
| Component standards | IEC 60947 and IS 8623 compliant switchgear; enclosure ingress per IEC 60529 |
| Assembly practice | IEC 61439-1 practice and MNRE guidelines for solar installations |
| Testing | Routine tests and inspection at the works before dispatch, with test report |
| Facility | Kotambi, Vadodara, Gujarat, India |
| Delivery | 6 to 7 weeks from drawing approval, subject to switchgear availability |
Where the ACDB Sits — and What Feeds It
In a single-inverter plant the inverter output lands directly in the ACDB. In multi-inverter plants an AC combiner box first collects the inverter outputs close to the inverters, and one protected feeder runs to the ACDB. Upstream of the inverter sit the DC boards — AJB and DCDB — described with the whole chain on the solar BOS electrical package page. For 800 V AC high-voltage inverter fleets, the distribution point is built as an 800V LT panel.
What to Send for an ACDB Quotation
The inverter schedule (models, count, output rating, phases), the feeder arrangement to loads and grid, the DISCOM connection specification including metering and net-metering requirements, indoor or outdoor mounting with the IP rating, and the site single line diagram. With these five the board is engineered without assumptions.
Common Mistakes in ACDB Specifications
- Metering provisions left to "as required" — the DISCOM's connection specification decides the meter chamber, CT class and isolation arrangement; get it in writing before the enclosure is sized
- Breakers rated to the inverter frame, not its actual maximum output current
- SPD treated as optional — the ACDB is the plant's AC surge collection point
- IP rating chosen by habit — an outdoor ACDB needs IP65 minimum and a canopy
- No spare ways — plants get extended; two spare feeders cost little at build time
How Wisdom Techno Solutions Builds AC Distribution Boards
An ACDB is an LT panel and is built like one: busbar and feeder sizing with thermal margin, clearances per LT practice, IEC 61439-1 assembly discipline, GA and SLD drawings submitted for approval before manufacturing, routine tests and inspection before dispatch, and the test report shipped with the board. The same works builds the rest of the solar package, so the boards arrive matched in enclosure practice and labelling.
Related Technical Guides
- BESS Electrical Panel Design — PCS, ACDB & DCDB — the same boards in battery-coupled plants
- Load List & Incomer Sizing Guide — how combined currents size the upstream boards
- FAT & Routine Test Checklist — what is checked before any board leaves the works
- LT Panel Specification & RFQ Guide — how to specify a board so quotes are comparable
Related Panel Types
If this is not the right fit for your layout, these are the related products we build to the same standard:
- Solar ACDB & DCDB — the AC and DC distribution pair of the plant
- AC Combiner Box — collects several inverter outputs before the ACDB
- Solar DCDB — the DC-side board before the inverter
- 800V LT Panel — the distribution point for 800 V AC inverter fleets
- Solar BOS Electrical Package — the complete solar board package from one works
Send Your Single Line Diagram
Email your single line diagram, load list and system fault level and our engineers will come back with a technical offer. Not sure what to send? See what a panel manufacturer needs in order to quote accurately.
| Manufacturer | Wisdom Techno Solutions |
| Works | Plot 9, Nilkanth Industrial Park 1, near Kotambi Stadium, Kamrol, Kotambi, Vadodara, Gujarat 391510, India |
| connect@wisdomtechnosolutions.com | |
| Phone | +91 80002 29727 |
| Working hours | Monday to Saturday, 8:00 am to 5:00 pm IST |
| Delivery lead time | 6 to 7 weeks from drawing approval, subject to switchgear availability |
Frequently Asked Questions About AC Distribution Boards
Page updated: 17 September 2026