Open Access Solar Savings Calculator

Free calculator from Wisdom Techno Solutions, Vadodara — instant result, detailed report on request

Free tool for consumers above 1 MW

Open access solar savings calculator

Enter your units, your current landed tariff and the open access offer you have. See the true landed cost of open access power after surcharges, wheeling, losses and banking, the saving per unit, and the saving per year on the share of units you move. Runs in your browser; nothing is uploaded.

This calculator needs JavaScript. If nothing appears below, enable JavaScript or send us your bill and we will run the numbers for you.

Your figures

Required

Total bill divided by units

From the developer's offer

For a fuller picture

Open access generally needs 1 MW or more

Assumptions you can change

From the GERC order; often waived for green power

Application, metering, scheduling

Indicative calculation; verify with engineering before ordering.

Your numbers

Fill in the required figures to begin.

What open access power really costs

The headline price is not the landed price

A developer's offer of three and a half rupees a unit arrives at your meter with cross-subsidy surcharge, additional surcharge, wheeling and transmission charges, losses in transit and banking charges on energy that does not match your consumption hour by hour. Each is set by the GERC order in force and each changes. The calculator adds them up so the comparison with your own tariff is honest.

Open access or captive?

Group captive and behind-the-meter solar avoid most of these charges, which is why on-site solar with storage often beats open access for plants with roof or land. Open access wins when the site has no space and the load is large and steady. Many plants do both.

What is assumed

  • Surcharges and losses at the values you set; check them against the current GERC order before relying on the result.
  • Banking charges apply to the share of open access energy that does not coincide with your load.
  • Eligibility is indicated on contract demand only; the DISCOM's own technical feasibility applies.

Who is eligible for open access in Gujarat?

Broadly consumers with contract demand of 1 MW and above, subject to the GERC regulations in force and the DISCOM's technical feasibility. Green energy open access rules have changed the thresholds and surcharges; check the current order.

Is captive solar cheaper than open access?

For a plant with roof or land, usually yes, because on-site generation avoids wheeling, losses and most surcharges. Open access suits large, steady loads with no space. The payback estimator covers the on-site case.

What is banking and why does it cost money?

Energy you generate or buy at an hour you do not need is banked with the DISCOM and drawn later, for a charge in kind or in cash. Storage on site removes most of the banking need.

What could you save?

Enter your monthly electricity bill and see where the money goes, in two minutes.

₹
Talk to a solar engineer
+91 80002 29727

Solar + BESS questions answered (FAQ) →

Green Energy Solutions

Illustration: Solar + BESS EPC

Solar + BESS EPC

Solar, storage and hybrid plants for industry, with the switchboards built in our own works.

Explore Now
Illustration: Industrial Solar EPC

Industrial Solar EPC

Captive rooftop and ground-mount solar with the electrical side engineered in-house.

Explore Now
Illustration: Battery Storage (BESS) EPC

Battery Storage (BESS) EPC

Storage that holds your plant up when the grid drops and trims demand charges.

Explore Now
Illustration: Hybrid Solar + BESS

Hybrid Solar + BESS

Solar and storage under one EMS to cut DG hours and peak demand.

Explore Now
Illustration: Electrical Balance of Plant

Electrical Balance of Plant

LT switchboards, ACDB, DCDB and protection built and tested in Vadodara.

Explore Now
Solar ACDB / DCDB

Solar ACDB / DCDB

AC and DC distribution boards for solar plants, from our Vadodara works.

Explore Now